| Set as Homepage | Save desktop | Chinaexporter | Mobile | QR code

Henan kefan Industry mining machinery CO,LTD

brick making machine,brick machine

News Category
  • No Category
Search
 
Link
The company hasn't been verified!
You are now at: Home » News » Machine installation details crusher
News
Machine installation details crusher
Posted on: 2013-04-25        Hits: 75        Back to List
 Installation details ofjaw Crusher Jaw crusher is an important equipment of stone production line, to setup the all specifications of the crusher, is basically the same, the difference is only decided by the structure of each part weight and parts. jaw Crusher is installed on a concrete foundation. In order to reduce the vibration and noise, cone Crusheryou'd better pad hardwood backing plate between the the crusher and the concrete foundation, rubber belt and other shock-absorbing materials. Large crusher should be installed in the steel is embedded in the basis, and should pad the elastic plate in the frame and steel intermediate. Basic cone Crusher will be separated and building foundation, in order to avoid crushing harmful vibration machine generated to plant. Basic height, depth and area, should be based on soil conditions, calculated separately for each kind of specification of crusher. Design basis,should consider the installation acceptance of crushed product transport belt, the replacement and repair of thrust plate adjustment device required space, at the same time, also want to pass entrance installation of anchor bolts required. The crushed product to go through the crusher bottom longitudinal discharge trough discharge, discharge from the side of the foundation is not allowed. Row ore coffin foundation to spread a layer of metal plate. Middle and base of tunnel shall be of sufficient height, break free from obstacle products shipped out. In order to heavy parts Lifting jaw crusher, the jaw Crusher plant, is provided with a movable lifting equipment (such as bridge crane etc.). Lifting equipment must be selected according to the crusher is heavy, the weight of zero parts. Before assembling the frame, must carefully check all the joint surface is correct, in the installation and calibration of the frame, tighten the anchor bolts, the gap between the frame and the foundation in filling. The assembled movable jaw into the frame. The shaft neck should enable the mandrel into in the bushing. The bearing and the jaw shaft shoulder end surface, should be required to leave a gap. In the installation of connecting rod before,should cooperate with the axis neck check the connecting rod bearing and the eccentric shaft corresponding to the.At the same time,check the main bearing and the frame with the site whether is correct.

Henan Kefan Mining Machinery Co,Ltd. is a professional mining machinery manufacturer.Our Company provide brick making machine,brick making machine,cone Crusher,vibrating screen,conveyor,Stone Crusher,Stone Crushing Plant,hammer crusher,Sand making machine,roller crusher,circular vibrating screen, Autoclave Aerated Concrete Equipment,block machine,brick making machine,brick machinecutting machine,dry machine,jaw Crusher,magnetic separator,casting machine,etc.